Published Sunday, February 21, 2021.
The Inland Rail project – currently under construction – will connect Melbourne to Brisbane; however, current plans have it terminating at Acacia Ridge in Brisbane’s southern suburbs.
This means freight earmarked for the Port of Brisbane must be trucked in on existing roads unless a dedicated Inland Rail link is constructed.
I’m fighting to deliver the Missing Link – a dedicated underground freight rail connection between the Inland Rail and Port of Brisbane.
Without this vital infrastructure, Brisbane’s roads will be gridlocked with a further 2.4 million trucks by 2035.
Check out our campaign and stay up to date by filling out the form below.
Port of Brisbane – https://www.portbris.com.au/
Inland Rail – https://inlandrail.artc.com.au/
Sign up here and stay up to date with the Missing Link campaign to deliver a dedicated rail connection between Port of Brisbane and the Inland Rail at Acacia Ridge.